C-4
– Boiler, Hot Water Heating and Steam Fitting Contractor
A boiler, hot-water
heating and steam fitting contractor installs, services and repairs
power boiler installations, hot-water heating systems and steam
fitting, including fire-tube and water-tube steel power boilers and
hot-water heating low pressure boilers,steam fitting and piping,
fittings, valves, gauges, pumps, radiators, convectors, fuel oil tanks,
fuel oil lines, chimneys, flues, heat insulation and all other
equipment, including solar heating equipment, associated with these
systems.
The Boiler, Hot Water
Heating and Steam Fitting (C-4) Examination is divided into six major
sections. These sections are:
1. Job
Planning/Estimating (14%)
- Boiler design
- Boiler
calculations
- Boiler codes
2. Hydronic
and Steam Systems (35%)
- Boiler
preparation and layout
- Boiler/equipment
installation
- Valve, piping,
and hanger installation
- System
preparations
- Insulation and
penetration sealing
3. Radiant
Panel Systems (13%)
- Piping and
equipment installation
- Temperature
controls and wiring
- System start
up/testing
4. Heat
Exchangers (5%)
- Maintenance
access requirements
- Vacuum breakers
and control valves
5. Service
and Maintenance (18%)
- System shut
down
- Troubleshooting
- System cleaning
and repair
- Testing and
start up
6. Safety
(15%)
- Identification
of job site hazards
- Worker safety
*Percentages
are approximate*
The following
questions are typical of the types of items that are on the
examination. The correct answer is highlighted.
1. Which of
the following precautions should be taken when welding near combustible
materials?
a. have some sort of
extinguishing device readily available
b. stay
clear of the sparks
c. try
to direct the sparks away from the combustible material
d. use
a heat shield
2. What is
the advantage of a gate valve over a globe valve?
a. a
globe valve is more expensive
b. a gate valve provides
straight through full flow
c. a
gate valve is easier to install and service
d. a
globe valve provides straight through full flow
3. What is
one of the functions of a McDonnell-Millier feeder valve on a boiler?
a. to protect the boiler
from firing at a low level condition
b. to
protect the boiler from firing at a high level condition
c. to
keep water at a very low level
d. to
keep water at a very high level
*All
questions are written and reviewed by licensed contractors who are
actively working in the field*
American
Society of Mechanical Engineers-Boiler and Pressure Vessel Code.
ASME,
22
Law Drive, P.O. Box 2300,
Fairfield,
NJ 07007-2300.
(973)
882-1167. FAX: (973) 882-1717.
INTERNET:
www.asme.org
Cal/OSHA
Construction Safety Orders.
California
Code of Regulations, Title 8,
Industrial
Relations, Division 1, Chapter 4, Subchapter 4.
Barclays
Law Publishers,
P.O.
Box 95767, Chicago, IL 60694.
(800)
888-3600. FAX: (415) 732-8861.
OR
Building
News, Inc.
1612
S. Clementine Street,
Anaheim,
CA 92802
(800)
873-6397. FAX: (714) 535-8078.
INTERNET:
ccr.oal.ca.gov/cgi-bin/om_isapi.dll
or www.bni-books.com
Uniform
Plumbing Code.
International
Association of Plumbing and Mechanical Officials (IAPMO).
20001
Walnut Drive South
Walnut,
CA 91789.
(909)
595-8449
Publication
orders: (800) 85-IAPMO
FAX:
(909) 594-3690.
INTERNET:
www.iapmo.org
Uniform
Mechanical Code.
International
Conference of Building Officials and International Association of
Plumbing and Mechanical Officials,
5360
S. Workman Mill Road,
Whittier,
CA 90601.
(310)
699-5880. FAX: (800) 284-4406.
INTERNET:
www.icbo.org
or www.iapmo.org
|